Wilson Engineering worked with TetraTech, Inc. to provide contract administration, inspections and materials testing for the Downtown Seawalk Miner's Cove to Franklin Dock project. The Project extended the popular Downtown Seawalk from Miner's Cove to the Franklin Dock, alleviating the congestion on the narrow sidewalk along South Franklin Street. The project consisted of (49) 14-inch steel pipe piles and associated steel pile caps, pier timberwork, and steel cable deck rail. It also included an artistic glass canopy and windscreen system, concrete planters, landscaping, lighting and associated electrical work, and minor utility and paving improvements.

Final completion in September 2014. Construction Budget: $3.9 million.