Wilson Engineering completed Special Inspections for the JNU Aircraft Rescue and Firefighting Station Modifications. Construction included demolition of the existing and construction of a new 12,200SF structural steel building wing on cast-in-place foundation to house the Airfield Firefighting Equipment. Special Inspections included reinforcing steel/concrete, soils, high-strength bolting, and welding inspections.

Final Completion in September, 2017. Construction Budget: $1.8 Million.